OUR ONGOING PROJECTS
MBD SEWAY PARTNERSHIP
Our company carries out the installation of SCADA, RTU, FOAS, LDS systems and the supply and manufacturing of instrumentation and fiber optic cables within the scope of the TPAO TDLYPM-219 Şehit Esma Çevik Crude Oil Pipeline Phase-1 construction project.
With these systems, pipeline safety, sealing control, automation and monitoring processes are carried out.
OUR COMPLETED PROJECTS
DORA ENVIRONMENT
Tüpraş Batman Refinery Wastewater Unit Odor Removal System
Our company has successfully completed the Tüpraş Batman Refinery Wastewater Unit Odor Removal System project. Within the scope of the project, the Distributed Control System (DCS) that will provide automation of the odor removal system has been supplied and installed. In this project, the efficiency of the operating processes and environmental sustainability have been increased by using the latest technology.
The project aimed to reduce the negative impacts on the environment by optimizing odor management and to improve the refinery's wastewater management performance. Our company continues to offer quality and reliable solutions with its extensive experience in the installation and commissioning of such systems.
SAMSUN SEWAGE PARTNERSHIP
Our company provided comprehensive services in the fields of electricity, instrumentation and lighting in a project carried out in Samsun with the Samsun Setyol Partnership. In the project, both indoor and outdoor lighting solutions were provided; energy lines and instrumentation systems were installed safely and efficiently. All work was completed on time and according to high quality standards in accordance with the project requirements. The meticulousness and expertise shown by our company in this project was appreciated by our business partner.
TUPRAS BATMAN REFINERY
Batman TÜPRAŞ Refinery Natural Lighting Project Successfully Completed
Our team has successfully completed the installation of 44 natural lighting systems at Batman TÜPRAŞ Refinery. In this project, we aimed to increase the energy efficiency of the refinery and ensured maximum use of natural light. Thanks to carefully selected materials and correct layout planning, we contributed to both improving the working environment and achieving significant savings in energy consumption at the refinery.
Our work has been carried out within the framework of the highest safety and quality standards, and environmental impacts have been minimized.
SCAFFOLD ELECTRICAL AND INSTRUMENT INFRASTRUCTURE RENOVATION WORKS
Our company has undertaken the construction of the electrical and instrument infrastructure systems of the hooks at the pier within the scope of the Pier Electrical and Instrument Infrastructure Renovation Works carried out for Global Terminal Services. Within the scope of this project, the necessary electrical connections and instrumentation systems were established for the hooks at the pier to operate safely and effectively. The renovation and infrastructure improvement works were carried out meticulously in order to increase operational efficiency and ensure the longevity of the infrastructure.
EPC UPGRADİNG THE CONTROL SYSTEM FOR AL LUHAİSS DEGASSİNG STATION
Our company played a significant role in the modernization of the control system (EPC upgrading) project of Al Luhaiss Degassing Station in Basrah, Iraq, carried out with Basrah Oil Company (BOC). Within the scope of this project, the control systems of the gas separation station were successfully updated and improved. The efficiency and safety of the station were increased with advanced automation solutions and modern technologies, and the smooth running of operations was ensured. Our company's technical expertise and meticulous approach in this project contributed to the more efficient operations in the region.
BOTAŞ-150,000 BBL STOCK TANK PROJECT
Our company has undertaken the construction of electrical, instrumentation and automation works of the tank within the scope of BOTAŞ 150,000 BBL Stock Tank Project. Within the scope of the project, the installation of the electrical infrastructure, integration of instrumentation systems and automation solutions have been successfully carried out for the safe and efficient operation of the tank. All operations have been completed on time in accordance with high quality standards and have made a great contribution to the project. In this way, the operational efficiency and safety of the stock tank have been increased.
TPAO-2,000 KCAL/H HOT OIL
Our company has successfully completed the installation of the hot oil system within the scope of the TPAO 2,000 kcal/h Hot Oil Exchanger Facility Project. Within the scope of the project, the integration of the hot oil system providing high efficiency has been made, the energy needs of the facility have been met and the operational processes have been improved. During the installation process, our work has been carried out meticulously in accordance with all safety and quality standards and the system has been put into operation without any problems.
TPAO GENERAL DIRECTORATE TRANSFORMER AND INFRASTRUCTURE WORK
Our company has successfully completed the installation of critical electrical infrastructure and the integration of transformer systems within the scope of the Transformer and Infrastructure Project carried out for the General Directorate of TPAO. This project aims to ensure safe and efficient energy flow and includes important engineering works such as the modernization of infrastructure systems and the installation of transformers. Our company has contributed to the smooth completion of the project by working in accordance with high quality standards in all processes.
TPAO BATMAN REGIONAL DIRECTORATE POWER PLANT BUILDING AND MATERIAL WAREHOUSES FIRE ALARM SYSTEM AUTOMATION WORK
Our company has successfully completed the Fire Alarm System Automation project for the Power Plant and Material Warehouses for the TPAO Batman Regional Directorate. Within the scope of this project, a modern fire alarm system automation was established in order to increase fire safety and provide rapid response to emergencies. The system protects the building and warehouse areas against fire hazards, while contributing to the minimization of possible risks with early warning mechanisms. All installations were made in accordance with high safety standards.
TPAO REGIONAL DIRECTORATE TANK TRANSPORT MEASUREMENT WORK (BATMAN, MARDIN, DIYARBAKIR AND SIIRT)
Our company has successfully completed the Tank Transportation Measurement Work covering Batman, Mardin, Diyarbakır and Siirt provinces for the TPAO Regional Directorate. Within the scope of this project, precise measurement operations were carried out for tank transportation operations and the necessary technical analyses were carried out meticulously. Measurement processes were implemented at high standards in order to carry out the operations in the region efficiently and safely.
PETROLEUM OFFICE DIRECTORATE (POAŞ) FILLING STATION FIRE DETECTION SYSTEMS
Our company took part in the Filling Station Fire Detection Systems project carried out for the Petrol Ofisi Directorate (POAŞ). In this project, modern fire detection systems were installed and put into operation in order to ensure the fire safety of the filling station. By using sensitive detection technologies to minimize fire risks, rapid intervention was provided in emergency situations. All work was carried out in accordance with international safety standards.